• Seamless Medium-Carbon Steel Boiler and Superheater Tube
  • Seamless Medium-Carbon Steel Boiler and Superheater Tube
  • Seamless Medium-Carbon Steel Boiler and Superheater Tube
  • Seamless Medium-Carbon Steel Boiler and Superheater Tube
  • Seamless Medium-Carbon Steel Boiler and Superheater Tube
  • Seamless Medium-Carbon Steel Boiler and Superheater Tube

Seamless Medium-Carbon Steel Boiler and Superheater Tube

Type: Seamless
Technique: Hot Rolled
Material: Carbon Steel
Surface Treatment: Varnishing
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
Section Shape: Round
Samples:
US$ 5/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Rating: 4.0/5
Manufacturer/Factory

Basic Info.

Model NO.
EZS
Standard
ASTM
Surface
Hot Galvanized, Cold Galvanized, Painted
Length
Random Length
End Procession
Bevel End or Plain End
Delivery Condition
Annealed, Normalized, Normalized and Tempered
Inspections and Tests Performed
Ut, Rt, Et
3-Rd Party Inspection
TUV, SGS, Ibr, BV etc
Delivery Time
7-30 Days
Transport Package
Wooden Box/ PVC Bags/ Steel Strips/Plastic Plates
Specification
OD: 6-830mm, WT: 1.6-30mm
Trademark
EZS
Origin
China
Production Capacity
300000t/Year

Product Description

ASTM A106b /SA179 Grades Steel Carbon Ms Seamless Steel Boiler Tube / Water Pipe/Casing and Tubing

1.Product name Line pipe,API 5L Line pipe,Seamless steel pipe
2.Material A,B,X42,X46,X52,X56,X60,X65,X70,X80,L245,L290,L360,L415,L450,etc.
3.Standards API 5L PSL1 & PSL2,GB/T9711.1,GB/T9711.2
4.O.D. 6-830mm
5.W.T. 1.6-30mm
6.Length 5.8 meters for 20' container, 6 meters to 12 meters for 40' container
7.Application Conveying oil,water,gas,etc.
8.Package Export standard package.
9.Shipment 15-30 days afer receiving the deposit.
10.MOQ 1T



Seamless Medium-Carbon Steel Boiler and Superheater Tube
Seamless Medium-Carbon Steel Boiler and Superheater TubeSeamless Medium-Carbon Steel Boiler and Superheater Tube
Seamless Medium-Carbon Steel Boiler and Superheater Tube
Seamless Medium-Carbon Steel Boiler and Superheater Tube


FAQ

Q: What's your minimum order quantity?
A: Our minimun quantity is 500 Kg. We also can offer you samples.
Q: What's your delivery time?
A: Our normal delivery time is 7-30 days, and it depends on your quantity and items. Of course, if you need products urgently, we also will consider arranging it firstly.
Q: What's the price of your product?
A: Our prices are based on the material grade, size, quantity and physical performance etc. So if you can offer us the detailed information, then we can give you the best reasonable price. Also, we can do special size and color for customers.
Q: What's your after-sales service?
A: We have two ways to handle claims by replacement and deduction. Of course, if the materialis not good used by wrong parameter from customer, we won't be responsible.
Q: Why do you think I will want to buy from you?
A: We have advantages with 25 years of professional experiences in manufacturing & designing, advanced technology & the first-class equipment, perfect logistics management, high-quality after-sales service and competitive price.



Seamless Medium-Carbon Steel Boiler and Superheater Tube

Seamless Medium-Carbon Steel Boiler and Superheater Tube
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now