Hunan, China
Business Type:
Manufacturer/Factory, Trading Company
Registered Capital:
2000000 RMB
Plant Area:
501~1000 square meters
Management System Certification:
ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, ANSI/ESD
Average Lead Time:
Peak season lead time: 1-3 months
Off season lead time: within 15 workdays
Sample Available

Seamless Tube, Stainless Steel Pipe, Steel Tubing manufacturer / supplier in China, offering Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers, API 5L Grade B Carbon Steel Welded Oil and Gas Pipe, API 5L Grade B ERW Welded Black Steel Pipe for Structural and Building Work and so on.

Diamond Member Since 2019
Audited Supplier
Supplier Homepage Products Steel Pipe & Tube Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
  • Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
  • Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
  • Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
  • Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
  • Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
  • Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers

Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers

Min. Order / Reference FOB Price
1 Ton US $500-800/ Ton
Port: Shanghai, China
Production Capacity: 2000 Tons/Month
Payment Terms: L/C, T/T
Type: Seamless
Technique: Cold Drawn, Cold Rolled
Material: Carbon Steel, Stainless Steel, Alloy Steel
Surface Treatment: Bare, Black, Oil, Vanishing
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose, Gas Pipeline
Section Shape: Round

You Might Also Like

Loading...

Basic Info.

Model NO.
EZS
Product
Bearing Steel Tubes Seamless Pipe Water Pipe
Standard
ASTM A179, En10216-2, ASTM A213, ASTM A249/A269
Grade
304, 304L, 316, 316L, P5, P9, P11, P22 etc
Surface Condition
Oiled, Pickled, Passivated, Polishing
Delivery Condition
Annealed, Normalized, N+Tempered
Coating
Black/Varnish/Oiling
End Type
Plain End, Bevel End
Delivery Time
15-60 Days
Application1
Heat Exchanger, Boiler, Condenser Tube
Application2
Hydraulic Tubes & Instrumentation Tubes
Mill Test
NDT Test( X-ray Test, U.T, E.T ), Hydraulic Test.
Shipment Method
by Container, LCL Cargo or Break Bulk Vessel
Trade Term
Fob, CFR, CIF, DDP, DAP
Certificate
SGS, BV, TUV etc
Trademark
EZS
Transport Package
Bundled, Plywood Wooden Case, Water Proof Package
Specification
15-219 mm
Origin
China
HS Code
7304
Product NameCold Finished Seamless Carbon Alloy or Stainless Steel Tubing for Boiler and Heat Exchange System (SA179/192/A210/SS304/SS316)
Production Standards & MaterialsASTM A213/A269/A312/A335/A778
ASTM A179/178/192
EN10216-1 P195TR1/TR2, P235TR1/TR2, P265TR1/TR2
EN10216-2 195GH,P235GH,P265GH,TC1,TC2
DIN17175 ST35.8, ST45.8
JIS G3454 STPG370, STPG410
JIS G3461 STB340, STB410, STB440
Outside Diameter Ranges15mm-219mm
Wall Thickness Ranges1mm-15mm
Length (negotiable)5.8m
6m,12m,14m
As per request
Pipe TypeCold Finished
Pipe End1> 8-60mm Plain End;
2> 60-168.3mm Plain End or Beveled End
End protector1> Plastic pipe cap; 
2> Steel Socket
PackingSeaworthy packing(bundled according to the different size),
with plastic bags or plywood box.
Out Surface TreatmentBared, Black Painted, Varnish, Oil-dip, Passivation, Phosphating, Shot blasting
InspectionWith Hydraulic Testing, Eddy Current, Infrared Test
ApplicationLow-Pressure Liquid, Water, Gas, Oil, Line Pipe, Heat-Transfer Equipment,
such as tubular heat exchanger, condenser and superheater, For high, middle,
low-pressure boiler and pressure purpose
Our advantages·Diverse products(Steel pipes, pipe fittings)
·Any third party inspection can be accepted
·Quick response for quotation, delivery, after-service.
·Focus on pipe & tube solution for project application.
  
 
 
www.ezsteeltube.com
Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers
Cold Finished Seamless Carbon Alloy and Stainless Steel Tube for Boilers and Heat Exchangers

FAQ

Q:  How soon can deliver after placing order?
A:  For stock:  within 5-7 days;
      For customized product:  around 30 days;
      For special sizes:  subject to negotiation.

Q: How is the quality control?
A: ISO 9001:2015 certified;
     Product certificate as per EN10204 3.1 or 3.2 as per customer's request.
  
Q: Can I have a factory-visit?
A:  Sure, we are glad to offer an invitation.

Q: Can I have a trial order?
A: Of course, it is an honor for us to have the opportunity.

Send your message to this supplier

*From:
*To:
avatar Mr. Michael
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Loading...

Contact Supplier

Mr. Michael
Project Manager