Customization: | Available |
---|---|
Function: | Water Boiler, Steam Boilers, Hot Water Boiler, Oil Boiler, Hot Air Boiler |
Fuel: | Biological |
Still deciding? Get samples of US$ 5/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ASTM T1 SA209 T1 Boiler Super-Heater Seamless Chromium-Molybdenum Steel Pipe
Product | Steel Grade | Standard | Size | Application |
Boiler Steel Tube | SA106B, SA106C, SA179,SA192, SA210A1, SA210C |
ASME SA106, ASME SA179, ASME SA192, ASME SA210 | φ10-1067mm | For manufacturing water cooled wall panel, economizer, reheater, superheater and steam pipeline of boilers in the industry of petrochemical and power. |
T1, T1a, T1b | ASME SA209 | φ10-219mm | ||
T5, T9, T11, T12, T22, T23, T91, T92 | ASME SA213 | φ19-127mm | ||
P5, P9, P11, P12, P22, P23, P91, P92 | ASME SA335 | φ60.3-1067mm | ||
ST35.8, ST45.8, 15Mo3, 13CrMo44, 10CrMo910, X20CrMoV121 | DIN17175 | φ6.35-1067mm | ||
P195GH, P235GH, P265GH, 16Mo3,13CrMo4-5,10CrMo9-10 | EN10216-2 | φ10-1067mm | ||
304/304L, 316/316L, 310S, 321, 347/347H | ASME SA213, ASME SA249 | φ4-159mm |
PRODUCTS
SHIPMENT
Business Type: | Manufacturer/Factory |
Main Products: | Carbon Steel Pipe , Stainless Steel Pipe , Copper Nickel Tube , Heat Exchanger Tube , Boiler ... |
Registered Capital: | 2000000 RMB |
Plant Area: | >2000 square meters |
Management System Certification: | ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, ANSI/ESD |
Average Lead Time: | Peak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workday |
SGS Serial NO. : | QIP-ASI199413Report Verification |
Holding the concept of First-class Brand, First-class Service, First-class Value, EZ STEEL GROUP is aiming to build up a win-win enterprise platform for both our customers and employees.